New information can be found further down in the object description. Updated 19/11
Energy storage - Capture Energy BESS PowerBox 500kW / 552kWh
- Energy storage system in container design
- The unit is a complete BESS (Battery Energy Storage System) system with associated safety fence as shown in the pictures.
Info:
-
Manufacturer: Capture Energy
-
Model: BESS PowerCombo-20C1H500K
-
Year of manufacture: 2023
-
Serial number: EsC-202312090001
-
Rated power: 500 kW
-
Maximum power: 550 kW
-
Energy capacity: 552 kWh
-
Rated mains voltage: 690V (via transformer, transformer not included)
-
AC current: 721.7 A
-
THDi: <3%
-
Frequency: 50Hz
-
Protection class: IP54
-
Temperature range: -20°C to +40°C
-
External dimensions: approx. 6,058 × 2,438 × 2,591 mm
-
Weight: 14.7 tons (with transformer not included)
-
Battery type: Lithium iron phosphate (LiFePO4) 690V
-
Communication: RS485, Ethernet, 4G/3G
-
Certificate: UL9540, UN3536
-
Fire extinguishing system: FK-5-1-12 / FM-200
-
Enclosure type: Container 20 ft
Accessories:
-
Security fence with barbed wire (approx. 10 m long side, 8 m short side)
-
Mounted on 8 feet
-
Cables between control cabinet and energy storage (approx. 30 meters) Control cabinet 690 V not included
Other information:
-
The device is reportedly still plugged in and requires disconnection by an authorized high-voltage electrician.
-
Demolition permit not available, must be applied for
-
Cables between the switchboard and the container need to be removed and the ground restored by the buyer.
-
More specifications and information are available if needed, contact the responsible administrator if interested.
-
Transformer not included
-
Original purchase price (2023): 3,548,000 SEK excl. VAT.
Updated info: (When more info is received, we will update as below.) This info has been received from the bankruptcy estate's documentation.
- Information about the network owner: Technical Works Katrineholm Elnät
- Distance from connection point of BESS (m) 30 (M)
- Electricity trading company: Bixia
- Test Report uploaded below
- Abeka has been the electrical contractor for the construction of the Energy Storage Facility.
-
BESS is not energized. There are additional costs to test and energize BESS.
-
Operating time that BESS has been running - It was running for about 6 months.
-
Capacity of the connection - reportedly 2 MW
-























































































