Mezzanine level 16 x 26.5 meters approx. 424 m² of steel structure for storage space or production for dismantling, with associated stairs and railings.
NOTE: Dismantling must be completed before the end of January.
Friday, 2026-01-16
Divestment of mezzanine floor - approx. 424 m²
Mezzanine level 16 x 26.5 meters approx. 424 m² of steel structure for storage space or production for dismantling, with associated stairs and railings.
NOTE: Dismantling must be completed before the end of January.

Log in
Login in with BankID