Construction scaffolding that weighs 50% less than the equivalent steel scaffolding.
U-Ram 73 x 200 cm makes assembly 25% faster.
Double railings and vertical diagonal braces are included.
Comes with U-Platform 307 x 61 in fiberglass that is secured against lift-off using the next U-Frame, L-beam or top stop.
Lightweight stair tower for safe and easy access to both floors.
Can be used in load class 3, (2.0 kN/m2)
10-year warranty on the scaffolding, approx. 1.5 years old.
U-Ram 73×200 (alu) - 17 pcs.
Work gloves (Leather) - 1 pc.
Double railing 207×50 (alu) - 1 pc.
Double railing 307×50 (alu) - 15 pcs.
L-Frame 73×100 (alu) - 6 pcs.
Top stop 73×100 (alu) - 4 pcs.
Diagonal Frame 307×200 (steel) - 2 pcs.
End stop (steel) - 3 pcs.
End skirting, FRAME® 73x15 (wood) - 7 pcs.
Spark strip 207x15 (wood) - 1 pc.
Spark strip 307x15 (wood) - 10 pcs.
L-Frame holder (steel) - 3 pcs.
Bottom screw 60 (steel) - 16 pcs.
Wall bracket 50 (steel) - 7 pcs.
Eye screw 120×12 mm (steel) - 7 pcs.
Lock bracket (steel) - 34 pcs.
Trailer for FRAME® / MODULAR LIGHT® - 1 pc.
Tension band 300 (polypropylene) - 8 pcs.
U-Platform 257×61 (glass fiber) - 2 pcs.
U-Platform 307×61 (glass fiber) - 10 pcs.
U-Stairs 257×200 (alu) - 2 pcs.
Stair railing, double 257×200 (alu) - 2 pcs.
U-Start boom (alu) - 2 pcs.
Bolt with spring lock 12x60 (steel) - 3 pcs.
Fixed Coupling MS 23 (steel) - 7 pcs.
Swivel Coupling MS 23 (steel) - 5 pcs.
Socket wrench, Reinforced - 1 pc.
Above is original when purchased, afterwards 10 extra legs and 6 top frames have been purchased which are also included.
Front aluminum box replaced with a larger and better stainless box.
Next inspection 2027-05-31.