Scaffolding Modular 12x6 Basic package 109 + stair tower
Lot consisting of three stair towers with associated scaffolding parts.
- The equipment is used.
List of contents:
Monzon Scaffolding
- Stair tower – 1 pc.
- End stop strip 73 wood – 5 pcs.
- Steel bar holder – 13 pcs.
- Stopper 207 wood – 1 pc.
- Bottom screw 80 steel – 1 pc.
- Spira 100 steel – 1 pc
- Spira 200 steel – 1 pc
- Spira 300 steel – 3 pcs
- Steel starter ring – 2 pcs
- Horizontal 73 steel – 11 pcs
- Horizontal 207 steel – 2 pcs
- Horizontal 307 steel – 3 pcs
- U-beam 73 steel – 6 pcs
- Planking box 73 steel – 6 pcs
- U-staircase 307 aluminum – 3 pcs
- Monzon stair railing 307 aluminum – 3 pcs.
- Bolt with spring lock steel – 1 pc.
- O-ring steel – 1 pc.
Modular 12x6 Base Package 109
- Bottom screw 80 steel – 10 pcs.
- Wall bracket 30 steel – 5 pcs
- Eyelet ring 8 steel – 5 pcs
- Spira 100 steel – 3 pcs
- Spira 200 steel – 7 pcs
- Spira 300 steel – 10 pcs
- Steel starter ring – 10 pcs.
- Horizontal 109 steel – 13 pcs
- Horizontal 307 steel – 8 pcs
- U-beam 109 reinforced steel – 10 pcs.
- Diagonal 307x200 steel – 1 pc
- Monzon railing 307 steel – 8 pcs
- U-plank steel – 24 pcs
- Fixed coupling steel – 5 pcs
- Bottom screw 80 steel – 4 pcs.
- Steel starter ring – 4 pcs
- Spira 200 steel – 2 pcs
- Spira 150 steel – 2 pcs
- Horizontal 307 steel – 2 pcs
- Horizontal 109 steel – 1 pc
- U-beam 109 reinforced steel – 2 pcs.
- O-ring steel – 1 pc.
- Hedge 100x85x100 – 1 pc
- Shipping – 1 pc
- Discount – 1 pc
- U-bracket – 2 pcs
- U-plank 109*32 steel – 2 pcs
- Bottom screw 80 Articulated steel – 1 pc.
- Steel starter ring – 1 pc.
- O-Horizontal 307 steel – 8 pcs
- Spire with pressed spigot 300 steel – 4 pcs.
- Spira with pressed spigot 250 steel – 4 pcs.
- Hedge 120x65x74 steel – 1 pc
- Spire with pressed spigot 150 steel – 4 pcs.
- Shipping – 1 pc
- U-beam 109 steel – 3 pcs
- Mesh fence 120x80x74 steel – 1 pc.
- Planking box 109 steel – 5 pcs
- Monzon railing 109x50 steel – 3 pcs.


























