Two pillar lift used previously in the municipal workshop.
NOTE: The lift will be dismantled prior to extradition.
Inspecta-inspected sept. 2018 according to pictures. The lift is in daily operation.
Arm extensions and cushions included.
The only known defect at the time of documentation is that one of the security detectors to prevent one arm moving in elevated position is bent and this must be addressed before the next inspection.